SP-Z1200 Full Automatic Toffee Feeding Pillow Packing Machine is used for the packing of solid products with regular shapes, such as candies,toffee ,soft sweets, hard candy , preserved fruit,Milk slice of sugar,etc.
1. Production Features of packing machine
The machine is used for the packing of solid products with regular shapes, such as candies,toffee ,soft sweets, hard candy, preserved fruit,Milk slice of sugar,etc.
machine size:
Features:
● Ultra-big feeding Plate, Double Paper Roller Automatic splicer device.
● Touch screen display, Single-chip micro-computer with steady performance, touch screen display.
● Automatic photocell tracking device, High precision cutting, and flexible for size adjustment.
Advantages:
● Advanced full servo motor and driver control system for easy maintenance, low failure rate, and stable performance
● Equipped with photoelectric automatic detection and servo dosing system.
● It can be connected directly with the producing line and can achieve the automation of feeding, forming, filling and sealing, and reduce the cost of labor.
2. Product specification of the packing machine
Packing Speed | 50-1200pcs/min |
Finished bag size | 50-80mm |
Total Power | 4.5KW |
Outside Dimensions | 2450mm(L)×1300mm(W)×1600mm(H) |
the packing shape of product | Rectangular, Round slice, ball shape, ellipse, waist round shape, cylindrical, block, etc. |
Weight | 980kg |
Power Source | 220V/50HZ(can be customized according to local voltage) |
Main electrical equipment configuration instructions
Full Automatic Toffee Feeding Pillow Packing Machine BOM Suitable for high-speed candy machine, speed up to 1200ppm, 100 sets of formula, knob speed adjustment Fixed length, calibration, automatic film connection, bag length modification in real-time, manual start without blocking film, triaxial independent switch, no reset required | ||||
Number | Name | Specifications and Models | Brand | Qty |
1 | PLC | ZSBZ-30T-C | xinje | 1 |
2 | touch screen | TG765S-XT | xinje | 1 |
3 | communication cable | DVP | xinje | 1 |
4 | servo drive | DS5K-20P7-PTA | xinje | 1 |
4 | servo motor | MS5S-80ST-CS02430-20P7-S01 | xinje | 1 |
5 | Servo power line | CM-P07-M-03 | xinje | 1 |
1 | Servo encoder line | CP-SP-BM-03 | xinje | 1 |
2 | servo drive | DS5K-21P5-PTA | xinje | 1 |
3 | servo motor | MS5G-130ST-CM10015-21P5-S01 | xinje | 1 |
4 | Servo power line | CM-L15-03 | xinje | 1 |
5 | Servo encoder line | CP-SC-B-03 | xinje | 1 |
6 | servo drive | DS5K-21P5-PTA | xinje | 1 |
7 | servo motor | MS5G-130ST-CM10015-21P5-S01 | xinje | 1 |
8 | Servo power line | CM-L15-03 | xinje | 1 |
9 | Servo encoder line | CP-SC-B-03 | xinje | 1 |
10 | temperature controller | XD-E6TC-P | xinje | 1 |
11 | solid-state relay | SSR-60 DA | Schneider | 3 |
12 | breaker | iC65N D 10A | Schneider | 1 |
13 | relay | RXM2LB2BD | Schneider | 1 |
14 | switching power supply | SDR-240-24 | MeanWell | 1 |
15 | power filter | FT111-20 | Feiaote | 1 |
16 | proximity switch | E2B-M12KS02-WP-C1 | Kim Lida | 2 |
17 | color mark sensor | GDJ-211 | Yatai | 1 |
18 | start button | LA39-01/G | APT | 1 |
19 | stop button | LA39-01/R | APT | 1 |
20 | inching button | LA39-01/Y | APT | 1 |
21 | emergency stop button | LA39-A1-2Z/R | APT | 1 |
22 | main power switch | LW42B32 | APT | 1 |
3. Production Application
● Food Packing
● candy Packing
● hardware packing
![]() | ![]() |
![]() | ![]() |
4.Production Details
● We have superb skills, accurate drawings, precision instruments, perfect machine parts
Photoelectric equipment detector:Control package length | film roller:Set of wrapping paper |
bag-former | Automatic film changing device without stopping the machine:the wrapping paper can be used continuously without stop |
Packing Sample:
● Our machine - packed products are beautiful and clean with low empty packing rate
![]() | ![]() |
![]() | ![]() |
5. Product Qualification
● Purchase system
Purchase order /Purchase plan→supplier selection→Supplier survey→supply sample→sample test→yes/no
Yes→Bulk purchase → delivery confirmation → sampling test → warehousing entry →settlement
● Order system
Order/ contract notice →Order assessment →Confirmation of advance payment →Prepare goods for production → Finished product inspection and storage → Confirmation balance payment → Delivery list →Confirmation of delivery date→ Shipment
● Machine outbound process
QC receive production inspection notice → Check the operation of each part → Check earth leakage, average current →Check the butter and anti-rust oil→ Check machine appearance → Test running speed and stability →OK → Notify to open delivery list
● After-sales service process
Received service request notice(email)→ Information registration → Reply and communication → Confirm the service content and time → Arrange dispatch → Site installation and debugging → Service complete→ Confirmation with the customer → Arrange return schedule → Regular visit
Our workshop and equipment
This is the workshop, the workshop is well lighted and all the workers are wearing overalls for their work.
![]() | ![]() |
● About us
![]() | ![]() |
● Our certification
![]() | ![]() |
![]() |
6. Deliver, Shipping And Serving
● What about the delivery time?
Place an order, sample photo, size, specification and model, requirement details (30-90 working days after the receipt of deposit)
● The payment term
TT /PayPal / Cash
● Package
Standard export package(non-wood case)
● Shipping
By Sea
FOB Ningbo / Shanghai
● After Service
1. One year quality guarantee for the main electrical parts (servo motor and servo drive) and the wearing parts are not covered by the warranty.
2. Provide online technical support, quick response to after-sales service.
3. Provide the complete process of installation, debugging, technology support and staff training (overseas service)when clients provide the Visa charge, round ticket, hotel, and commissioning fee.
4. Provide the electrical parts and accessories at EXW price for the long term.
7. FAQ
● Q: When can I get the price?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
● Q: How do you make your price?
A: We make the price according to our comprehensive costing. And our price will lower than the trade company because we are a manufacture. You will get a competitive price and better quality.
● Q: Can you guarantee your quality?
A: Of course. We are the manufacture factory. More important , we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
● Q: How long does the whole procedure being worked out?
A: After you place an order, the production handling time is about 45-60 days. We need 7 days to prepare all the stuff then 45 days for manufacturing.
● Q: Can you explain to me the whole transaction process?
A: 1. Sign Sales Contact
2. Arrange 30% deposit to our factory
3. Factory arrange production
4. Testing & detecting the machine before shipping
5. Inspected by customer or third agency through online or site test.
6. Arrange the balance payment before shipment.